top of page
The Nelson’s Project

Slade Elementary Refrigerant piping

High Standard HVAC llc has successfully completed the HVAC installation of Piping for the remote condensers for Slade Elementry in Laramie WY. Working with Climate Control out of Cheyenne on the project. We were able to finish the job on time and on budget. 

20131 Grove Street

MTFCU Boiler Replacment

Our Team replaced the boiler for a local bank. Utilizing two Weil McLain Evergreen 299 boilers integrated into their Building Automation system. Pulled out a Lochinvar 500kbtu that was starting to become increasingly unreliable due to lack of maintenance. The new boils will help the heat load for the coldest days as the single 500kbtu simply did not have enough for the radiant heaters around the glass exterior. 

The Jefferson’s Lake House

Pioneer Ave Boiler Replacement

High Standard HVAC llc Replaced the boiler in a residence off Pioneer Ave in Cheyenne. The original boiler from 1938 had the thermostat short out causing the boiler to over heat and fill water had been shut off so it ruptured the heat exchanger. Replaced with an 84% higher efficiency cast iron boiler form Pennco. 

  • Facebook
  • Instagram
  • Yelp
bottom of page